About 70 TWh a year across the EU, heading for 115 TWh by 2030. In Ireland they already take almost a quarter of the country’s electricity. Most countries can’t say what theirs use.
- ~70 TWh
- EU data-centre electricity use in 2024 (IEA estimate)
- ~115 TWh
- Projected for 2030
- 23%
- Share of Ireland’s metered electricity used by data centres in 2025
- 0
- Official figures for Malta’s data centres
Key findings
- Ireland’s data centres used 7,663 GWh in 2025, 23% of all metered electricity, up from 5% in 2015.
- There is no official EU-wide figure: estimates range from 45–65 TWh (JRC, 2022) to 70 TWh (IEA, 2024) and 96 TWh for wider Europe (ICIS, 2024).
- Only three national statistics offices publish a figure: Ireland’s CSO, the Netherlands’ CBS and France’s SDES. Malta publishes none.
Europe’s data centres used about 70 TWh of electricity in 2024, according to the International Energy Agency estimate the European Commission quotes. Estimates vary widely: the Commission’s Joint Research Centre put EU consumption at 45 to 65 TWh in 2022, 1.8% to 2.6% of EU electricity, while ICIS, cited by Ember, puts Europe at 96 TWh in 2024. By 2030 the same estimate rises to about 115 TWh, as AI pushes demand for computing up.
The striking thing is how little of this is measured. The Commission itself says the EU lacks precise data. When operators first reported under the Energy Efficiency Directive, 776 sites in 18 countries declared 16.7 TWh: less than a quarter of the estimated total.
Ireland is the outlier
Only a handful of countries publish a national figure. Ireland’s is the most dramatic. In 2025, data centres used 7,663 GWh, or 23% of all metered electricity in the country. In 2015 it was 5%. That is more than all of Ireland’s urban households combined, which used 18%, according to the same CSO release.
The growth has slowed, from four points in 2022 to one point in 2025. Meanwhile the rules have tightened. Ireland’s energy regulator now requires new sites above 10 MVA to provide dispatchable generation or storage on site or nearby, and to match 80% of their yearly demand with new Irish renewables within six years of connection.
Bigger totals, smaller shares
In absolute terms Germany uses the most: 20 TWh in 2024, by the industry association Bitkom’s estimate, against 12 TWh in 2015. Because Germany uses so much electricity overall, that is only about 4% of national demand, according to estimates by the analysts ICIS cited by Ember. In the Netherlands they used 5.1 TWh, 4.6% of the country’s electricity, up from 1.5% in 2017. In France, sites using more than 1 GWh a year consumed 4.3 TWh, about 1 to 1.5%.
- Germany (2024) 20 TWh
- Ireland (2025) 7.7 TWh
- Netherlands (2024) 5.1 TWh
- France (2024) 4.3 TWh
Malta: no number at all
Malta publishes no figure for its data centres. The closest the National Statistics Office gets is the whole information and communication sector, which used 55.2 GWh in 2024, 3.3% of non-residential smart-meter consumption. That covers telecoms, publishers and software firms as well as servers, so it can’t be read as a data-centre number.
Rules are catching up
On 21 September the Commission adopted a rating scheme for data centres above 500 kW, now under scrutiny by Parliament and Council, scoring them on heat reuse, clean energy and how flexibly they use the grid. The first labels are expected in 2027. Until then, the honest answer to how much power Europe’s data centres use is: about 70 TWh, give or take, and nobody knows exactly.
Proposed 21 September 2026 for data centres above 500 kW. Scores heat reuse, clean-energy supply and flexibility. First labels expected in 2027.
Since late 2025, new sites over 10 MVA must provide on-site or nearby generation or storage, and match 80% of annual demand with new Irish renewables.
Under the Energy Efficiency Directive, operators report energy use. The first round covered 776 sites in 18 countries and 16.7 TWh.
Most countries, Malta included, publish no official figure for data-centre electricity use.
Questions readers ask
How much electricity do data centres use in Ireland?
7,663 GWh in 2025, 23% of Ireland’s metered electricity, according to the Central Statistics Office. In 2015 the share was 5%.
How much electricity do EU data centres use?
About 70 TWh in 2024, by the IEA estimate quoted by the European Commission. The Commission’s Joint Research Centre put 2022 at 45 to 65 TWh.
What share of Dutch electricity goes to data centres?
4.6% in 2024 (5.1 TWh, preliminary), up from 1.5% in 2017, according to Statistics Netherlands (CBS).
What is the EU data centre rating scheme?
A scheme the Commission adopted on 21 September 2026 to rate data centres above 500 kW on energy use, heat reuse and clean power. First labels are expected in 2027.
How we did this
Country figures come from national statistics offices where they exist (CSO Ireland, CBS Netherlands, SDES France). Germany’s is an industry estimate (Bitkom; ICIS via Ember) and is labelled as such. Definitions differ: Ireland measures metered consumption of all data centres, the Netherlands counts only sites whose main activity is a data centre, and France covers sites using more than 1 GWh a year. EU totals are model estimates, not measurements.
Sources
- European Commission, DG ENER: Data centres – an energy-hungry challenge (17 November 2025)
- CSO Ireland: Data Centres Metered Electricity Consumption 2025 (7 July 2026)
- CBS: Datacenters verbruiken 4,6 procent van de elektriciteit (15 December 2025)
- Bitkom: Rechenzentren in Deutschland (10 November 2025)
- SDES: La consommation d’électricité des data centers en 2024 (2 July 2026)
- European Commission: New EU rating system for data centres (21 September 2026)
- JRC: Energy consumption in data centres and broadband networks in the EU (2024)
- William Fry: CRU final policy on data centre connections (15 December 2025)
- Ember: Grids for data centres in Europe (June 2025)
- DCD: Commission releases aggregate EED data-centre data
- NSO Malta: Non-Residential Smart Meter Statistics 2024